1. Title of the project: Project Controller
2. Abstract of the project:
Project
Controller is a simple, fast, accurate and easy to use with flexible options
for viewing the essential details. The solution is best suited for individuals
working on various projects, which helps to keep track of all the Projects and
their Schedules. Project Controller also helps you to back & restore your
work in a file so that you can always have a backup file to be restored to the
application just in case you lose your data accidentally. You can add any
number of schedules to be done for each existing projects using the Project
Controller. In This system each schedule can be tracked from the start till the
end of the Project cycle. You can track the below details for each schedule:
·
Project
for whom the schedule is to be done,
·
You’re
Rate/Hour for this particular work to be done.
·
Start
and End date of the project.
·
Total
working hours of a day (adjusted with the break time option).
·
Current
status and Percentage of work completed (Progress Bar).
·
Payment
amount pending from the project
The project has been
planned to be having the view of distributed architecture, with centralized
storage of the database. The application for the storage of the data has been
planned. Using the constructs of MS-SQL Server and all the user interfaces have
been designed using the ASP.Net technologies. The database connectivity is
planned using the “SQL Connection” methodology. The standards of security and
data protective mechanism have been given a big choice for proper usage. The
application takes care of different modules and their associated reports, which
are produced as per the applicable strategies and standards that are put
forwarded by the administrative staff.
The entire project
has been developed keeping in view of the distributed client server computing
technology, in mind. The specification has been normalized up to 3NF to
eliminate all the anomalies that may arise due to the database transaction that
are executed by the general users and the organizational administration. The
user interfaces are browser specific to give distributed accessibility for the
overall system. The internal database has been selected as MS-SQL server
200.The basic constructs of table spaces, clusters and indexes have been
exploited to provide higher consistency and reliability for the data storage.
The MS-SQL server 200 was a choice as it provides the constructs of high-level
reliability and security. The total front end was dominated using the ASP.Net
technologies. At all proper levels high care was taken to check that the system
manages the data consistency with proper business rules or validations. The
database connectivity was planned using the latest “SQL Connection” technology
provided by Microsoft Corporation. The authentication and authorization was
crosschecked at all the relevant stages. The user level accessibility has been
restricted into two zones namely.
PURPOSE
OF THE PROJECT
Project Controller aim is
to make the work simple, fast, accurate and easy to use with flexible options
for viewing the essential details. The solution is best suited for individuals
working on various projects, which helps to keep track of all the Projects and
their Schedules. It helps you to back & restore your work in a file so that
you can always have a backup file to be restored to the application just in
case you lose your data accidentally. You can add any number of schedules to be
done for each existing projects using the Project scheduler. In This system
each schedule can be tracked from the start till the end of the Project cycle.
3. EXISTING
SYSTEM
·
Cannot
Upload and Download the latest updates.
·
No
use of Web Services and Remoting.
·
Risk
of mismanagement and of data when the project is under development.
·
Less
Security.
·
No
proper coordination between different Applications and Users.
·
Fewer
Users - Friendly.
4. PRPOSED
SYSTEM
The development of the new
system contains the following activities, which try to automate the entire
process keeping in view of the database integration approach.
1.
User
friendliness is provided in the application with various controls.
2.
The
system makes the overall project management much easier and flexible.
3.
Readily
upload the latest updates, allows user to download the alerts by clicking the
URL.
4.
There
is no risk of data mismanagement at any level while the project development is
under process.
5.
It
provides high level of security with different level of authentication.
5.
Requirements:
HARDWARE REQUIREMENTS:
·
PIV 2.8 GHz Processor and Above
·
RAM 512MB and Above
·
HDD 20 GB Hard Disk Space
and Above
SOFTWARE REQUIREMENTS:
·
WINDOWS OS (XP / 2000 / 200
Server / 2003 Server)
·
Visual Studio .Net 2005
Enterprise Edition
·
Internet Information Server
5.0 (IIS)
·
Visual Studio .Net Framework
(Minimal for Deployment)
·
SQL Server 2000 Enterprise Edition
No comments:
Post a Comment